Tesko Steel History

For over 27 years!

1996

Tesko, a wholesaler of steel mill products, was established in 1996 in Knurów. The initial goal of the company was the purchase and sale of receivables, however, along with new experience and a highly-developed sense of orientation within the environment, the company took in the trade of steel mill products. Development our own work tactics based on the principle of partnership, and understood by us as a reliable and professional service rendered to contractors, had a significant impact on the company’s rapid development.

1998

After two years of operation, Tesko launched - in Rybnik at Żorska Street - a warehouse which allowed to maintain a high level of current inventory. In the same year, the company signed numerous dealership agreements with Czech and Slovak companies for the import of steel products in the following range: black square and rectangular profiles, black pipes and galvanized seamed pipes, hot-rolled sections and hot-rolled metal sheets. Import products constitute the backbone of the trade assortment maintained at the level of 80%. At the same time, Tesko worked with a number of national partners and sought to ensure a full range of steel products from different manufacturers.

1999

In 1999, we were awarded with title of “Fair Play Business” which proves that we follow the rules of business ethics and fair play. That same year, in August, we joined the Polish Union of Steel Distributors after obtaining reliability references from other member companies.

2002

In 2002, the company’s headquarters was moved to Rybnik along with the sales department. Aferwards, the new warehouse was opened at Brzezińska Street. As a result of the organizational changes, the company established a logistics center effectively supported by a transport base (10 vehicles with a capacity of 25 tons each). Assortment under continuous sale reaches a value of 10-13 million PLN, thanks to which Tesko ensures short delivery times and order fulfillment. It is also worth mentioning that prices of import products are at a level lower than their national counterparts.

2004

We were certified in 2004 with Quality Management System according to PN-EN ISO 9001:2000, which concerns the introduction and application of quality management systems in the field of retail and wholesale of metallurgical products.

2005

In 2005, we received the prestigious award from Dziennik Puls Biznesu and thus gained the title of “Business Gazelle”, which means that we were accepted among the fastest growing companies in recent years.

2006

Our contractors include both domestic and foreign companies. For this reason, we decided to change, and actually complement, the name of the company. We have been operating as TESKO STEEL since 2006.

2007

In autumn 2007, we launched our Steel Service Centre which is the most modern line for cutting sheet metal from coils.

Monthly capacity of the line amounts to 14,000 tons!

2008

Start of the expansion of the existing Steel Service Centre manufacturing plant.

2009

The launch of slitting line no.2.

2014

Launch of cross cutting line no. 3 to a thickness of 25 mm.

2017

Beginning of an investment and start of the expansion of a new part of the plant with an area of 9 hectares.

2018

Purchase of the fourth line for cross cutting and start of production of forms as well as diamond and trapezoid metal sheets in the new part of the plant.

Purchase of a transport base in Rybnik and launch of forwarding and logisticbusiness of daughter-company Tesko Steel Logistic sp. z o.o.

2019

The purchase of 85 sets of tractors with ultralight trailers and the launch of Tesko Steel Logistics sp. z o.o.

Purchase of the fifth line for slitting along with an automatic packaging machine for the production of copper strips as well as aluminum and zinc-coated sheets.

Completion of the first phase of Steel Service Centre and adaptation of a new object along with a new office building as well as achievement of full capacity at a level of 500,000 tons per year.

2020

Start of the construction of the second stage along with the expansion of the Steel Service Centre and the purchase of the sixth production line to increase production capacity to up to 600,000 tons per year.

2021

Launch of Line No. 6 for cross-cutting of steel in cold-rolled, galvanized, aluminum and coated grades, which is also the second line dedicated for the production of sheets, including rhombuses and trapezoids.

Start of the use of renewable energy sources in the steel processing. Start of the first  photovoltaic installation with a power of  368 KW.

Start of construction of Halls no. 5 and no. 10.

2022

Commissioning of the Hall no. 5 and 10, also a new social building and workshop rooms located at the new Hall no.5.

Extension of the renewable energy sources installation, which by the end of 2023 will cover up to 70% of the energy demand used in our plant will enable the sale of our final products bearing the Green Certificate.

The transport fleet of Tesko Steel Logistic reaches 140 trucks with ultra-light trailers.